MIL-PRF-52348D
4.3 Conformance inspection. Conformance inspection shall be performed on all kit production
units and shall include the examinations indicated in the conformance column of table II. Non-
conformance to any specified requirement, the failure of any test, or the presence of one or more
defects shall be cause for rejection.
4.4 Examination. The first article kit shall be examined as specified in table II. "Accept"
criterion is an item that conforms to the requirements in the referenced paragraph; the "reject"
criterion" is an item that does not conform to the referenced paragraph.
TABLE II. Examination schedule
Exam First Conf.
Examination description
Ref.
Method of
article
para.
inspection
101
X
X Kit components not in quantities as specified.
3.3.1
Visual \ Doc
102
X
Compression component not as specified.
3.3.3
Visual \ SIE
103
X
Hose retaining device not as specified.
3.3.4
Visual \ SIE
104
X
Pressure device not as specified.
3.3.5
Visual \ Doc
105
X
X Container not as specified.
3.3.6
Visual \ SIE
106
X
Materials not as specified.
3.6
Visual \ Doc
107
X
X Color and marking not as specified.
3.6.2
Visual \ Doc
Doc = Documentation, SIE = Standard Inspection Equipment
4.5 Tests. Testing shall be conducted as specified in table III.
TABLE III. Test schedule.
Test
Description
Ref.
Test
para.
para.
101
Hose assembly repackaging.
3.3.2
4.5.1
102
Compression component.
3.3.3
4.5.1
103
Hose retaining clamps.
3.3.4
4.5.1
104
Pressure device.
3.3.5
4.5.1
105
Container.
3.3.6
4.5.1
106
Low temperature.
3.4
4.5.2
107
High temperature.
3.4
4.5.3
4.5.1 Kit test. From a complete hose assembly (MIL-PRF-52262) packed in a flaking box,
extract the hose assembly to full length and remove all additional components. Utilizing the kit,
the kit manufacturer's procedures, and the flaking box loading diagram, repackage the hose
assembly and components into the flaking box. Failure to properly compress the hose assembly to
fit within the flaking box shall constitute failure of this test. Failure of the kit components to be
repackaged according to the flaking box loading diagram shall constitute failure of this test.
4
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business